For a custom quote
call 01283 531 645 today
Services & Spares
 

Loadbank sales

Established in 1983, Crestchic manufacture loadbanks for both AC & DC
applications. Based in Burton on Trent, we design and manufacture loadbanks
for those who require accurate and stable electrical test loads for the
commissioning and maintenance of power systems; including diesel generators,
gas turbines, UPS systems and various prime-movers. Our resistive loadbanks
offer capacities as small as 5kW up to 6000kW and resistive-reactive units
from 50 to 6250kVA at a variety of voltages up to 34kV. 

 

Loadbank rentals

Crestchic and Northbridge Industrial Services provide loadbank rental
services across the globe for both resistive and resistive-reactive applications.
With over 30 years of experience, we can tailor a loadbank test to your exact
requirements and delivery specification. From a small 20kW unit on a
supply-only short term rental, to large multi-megawatt high voltage
projects managed by our own experienced engineers, our loadbanks
are available when and where you want them.

Loadbank
service & repair

Our team of highly experienced engineers provide maintenance and
repair services for all Crestchic Loadbanks. Whether it’s mechanical,
electrical or software support, a one off repair or total support contract,
Crestchic has the expertise to ensure your loadbanks continue to
give 100% service for many years.

Discover more

Welcome to Crestchic Loadbanks

Crestchic Loadbanks is based in Burton Upon Trent, UK and has sales and rental offices around the world. Crestchic is the world’s largest specialised loadbank manufacturer and loadbank rental company. Crestchic was incorporated in 1983.Crestchic Loadbanks can be purchased or rented world wide.

Loadbanks are primarily used for testing electrical power output on diesel generators, gas turbines and UPS systems whilst carrying out commissioning and maintenance work. The loadbanks are used for simulating real electrical loads enabling essential setup and commissioning which ensures that all electrical and control parameters are met prior to power generation/back up equipment being energized on line.

News

Latest News - 12.01.13

£2 MILLION INVESTMENT CONFIRMS CRESTCHIC’S COMMITMENT TO GLOBAL LOAD TESTING RENTAL MARKET

Latest News - 11.01.13

CRESTCHIC LOADBANKS BACK UP KOREAN SHIPBUILDING SECTOR