The load requirement saw Crestchic transport two 20ft 6MVA loadbanks and three 2.9MVA transformers operating a 6.6Kv 60Hz, 3 phase system.
<Click to download>
BP PDQ PLATFORM IN EAST AZERI SIGNS
CRESTCHIC FOR 12.5MVA LOADBANK TEST
Owners of the recently commissioned Production, Drilling and Quarters (PDQ) platform based in East Azeri, contracted Crestchic Limited to undertake a 12.5MVA Loadbank test on the rigs’ Rolls Royce turbines.
<Click to download>
RFA DILIGENCE GETS 4.5MVA LOADBANK SOLUTION
AS PART OF £16m REFURBISHMENT PLAN
RFA DILIGENCE (A132), is undergoing a £16m refurbishment plan, which Crestchic has successfully provisioned a 4.5MVA loadbank test on the vessel’s 2.52Mw Wärtsilä generators.